I'd love to host a get together, but I'm honestly about a year away from having something to show off. The drivers won't ship for about three months. Those of you in Houston can imagine what the attic will be like in summer.

The IB will be done at some point this summer. I hope to have the center and mains done by the end of the summer too. First order of business is a new hutch for my entertainment center. I need something sturdy to hold that 100 lb center.
Excellent point about headroom, Chrisbee. I'd much rather overbuild than break something. Of course, I've never had a problem of going bigger on anything I do. It's that whole Napolean Complex thing.
