Home Theater Forum and Systems banner

1 - 3 of 3 Posts

·
Registered
Joined
·
261 Posts
Discussion Starter #1
atm you can copy a trace using (A+B)/2 but the copied measurement is left with ref time of t=0 no matter where the original traces are. It would be nice if this were set automatically and/or an explicit copy option were added that avoided the need to use trace arithmetic at all.

On a related note, can you add a few decimal places to the ref time control? It has ms precision on larger numbers.
 

·
Premium Member
Joined
·
6,711 Posts
I've set the window ref time for trace arithmetic results to be at the peak of the result IR for the next beta. I've also set the window ref spinner to have 1dp resolution for all values rather than changing to 0dp at values beyond 10.
 
1 - 3 of 3 Posts
Top